Welcome to my Westfield SEiGHT Build Site

Google | Westfield | WSCC
August 2005 | September 2005 | October 2005 | November 2005 | December 2005 | January 2006 | February 2006 | March 2006 | April 2006
Rolling Chassis | Drive Train | Electrics | Miscelleanous
Fellow Builders | Suppliers

Westfield SEiGHT Build

Rolling Chassis Tasks and duration

Item Description Duration (hrs:mins)
1 Fitting panels to Chassis 40:00
2 Installing Top mounted pedal box and box panels 02:30
3 Brake lines and connectors (trial fit and then fit) 25:30
4 Upper steering column 01:30
5 Install upper and lower rose joints on rear wishbones 01:00
6 Install nylon bushes into rear wishbones 01:15
7 Install upper and lower rear wishbones onto chassis 05:00
8 Install nylon bushes into front wishbones 00:20
9 Install upper and lower front wishbones onto chassis 02:00
10 Install rear shock absorbers and springs 01:30
11 Install lower steering column (UJ) and steering rack 01:15
12 Removal of Master Brake Cylinder for upgrade 00:20
13 Installation of upgraded Master Brake Cylinder 00:30
14 Install track rod ends 00:10
15 Fit Rear brake disc and trial fit road wheels to ascertain stud length 00:10
16 Install upper and lower ball joints 00:15
17 Torqued lower ball joints bolts to wishbone to 34Nm 00:10
18 Replace self tapping screws with rivnuts for Top Mounted box panels 00:30
19 Install handbrake lever 01:00
20 Install handbrake cable 00:30
21 Trial fit front uprights 00:20
22 Re-work nylon bush - inner steel sleeve fit, remval and re-fitting of wishbones 15:30
23 Install front shocker absorbers 00:15
24 Installing front discs to hubs, wheel bearings and hubs to uprights and calipers 05:00
25 Installation of top wishbone rose-joint conversion kit 03:00
26 Adjust track rod ends, attach road wheels, odds 'n' ends.. 01:00
27 Paint brake disc edges 01:00
28 Paint rear caliper sliders 01:00
29 Fitting fuel lines 04:45
30 Installing brake pads and adjusting hand brake cable 01:00
31 Installing rear sliders and calipers 01:30
32 Lower car from stands to ground and torque up rear hub nuts 00:30
33 Torque up front lower ball joint to upright 00:15
34 Torque up front suspension; dampers 00:20
35    
     
  TOTAL (so far) 120:35

 

 

 

Last updated October 21, 2009 | About me | Contact me | ©2005-2009 Adam Reeves