Miscellaneous Tasks and duration

Item Description Duration (hrs:mins)
1 Spray wheel stud ends 0:45
2 Spay inlet manifold and trumpet base with aluminum VHT 2:00
3 Produce dash template 3:00
4 Design and make plenum chamber model 20:00
5 Fabricate plenum chamber mould 4:00
6 Trim carbon fibre dashboard blank 1:00
7 Install fuel filler cap and connect to fuel tank 2:00
8 Install heat matting 2:30
9 Install interior panels 2:00
10 Install 4-point harnesses 3:00
11 Install carpets 2:00
12 Install gear level gator and bezel 1:00
13 Install side mirrors 0:30
14 Install handbrake surround 1:00
15 Design and fabricate bracket for Ford EDIS coil packs to Rover Engine 5:00
16 Re-work items for new IVA standards 8:30
17 Install new fuel filler hose 0:30
18 Underseal rear wheel arches 1:00
  TOTAL (so far) 60:30

 

 

 