Body work Tasks and duration

Item Description Duration (hrs:mins)
1 Adjusting ride height 3:00
2 Fitting but not fixing tub to chassis 4:30
3 Fettling skuttle to clear top mounted pedal box and steering column 3:00
4 Fitting bonnet and nose cone for alignment purposes not fixed down 0:30
5 Fettling boot box for rear mounted battery tray 2:00
6 Preparation and fitting of rear wings to tub 4:00
7 Fettling tub to provide clearance around weld seems in chassis 1:00
8 Aligning tub and pop riveting onto chassis 5:00
9 Install rollbar 1:30
10 Install nose cone 1:30
11 Make rear stoneguard template and install 1:30
12 Install bonnet locks and pins to nose cone, etc. 6:30
13 Trim, paint and install bonnet vent mesh 3:00
14 Trim, paint and intall nose cone mesh 3:00
15 Fix boot box to tub using concealled big head studs 1:00
16 Fit aeroscreen 1:00
17 Glueing down rubber edging 2:00
18 Drill wingstays for cycle wings 1:00
19 Installation of boot lip and lid 4:00
     
  TOTAL (so far) 49:00

 

 

 